Bathroom Renovation Done Right Starts Under the Tiles

Quick answer: in 2026, a full bathroom renovation in Bangalore (demolition, new waterproofing, CPVC plumbing, tiles and sanitaryware for a 5x7 to 6x8 ft bathroom) typically costs ₹1.5–₹3.5 lakh and takes 10–15 working days. A refresh without demolition costs ₹45,000–₹90,000. Stylfixx gives a free site visit and a written, itemised quote before any work starts.

Stylfixx renovates bathrooms in apartments, independent houses and offices across Bangalore, from a one-day fittings swap to a full strip-out. The part you can’t see after handover, the waterproofing and plumbing under the tiles, is where most renovations fail, so that is where we spend the most care.

Bathroom Renovation Services

Complete Renovation

Demolition, new waterproofing, concealed plumbing, floor and wall tiles, sanitaryware and fittings.

Tile-Over-Tile Makeover

New tiles laid over sound existing tiles, with no demolition.

Waterproofing Only

For damp walls where the tiles are still in good condition.

Plumbing Upgrades

Old GI pipes replaced with CPVC, concealed diverters and wall-hung WCs.

Fixtures

Shower glass partitions, vanities, mirrors, exhaust fans and moisture-proof ceilings.

Bathroom Renovation Cost in Bangalore (2026)

Typical 2026 Bangalore rates for a 5x7 to 6x8 ft bathroom, including labour and mid-range materials. Your exact price is fixed in a written quote after the free site visit.

ScopeTypical costTime on site
Refresh: new fittings, regrouting, paint, no demolition₹45,000 – ₹90,0003–5 days
Tile-over-tile makeover with new fittings₹80,000 – ₹1.5 lakh6–9 days
Full renovation: demolition, waterproofing, CPVC plumbing, tiles, sanitaryware₹1.5 – ₹3.5 lakh10–15 days
Premium: large-format tiles, wall-hung WC with concealed cistern, glass partition₹3.5 lakh and above15–20 days

Where the Money Goes in a Full Renovation

For a mid-range full renovation of a 6x8 ft bathroom, the budget usually splits roughly like this. The shares move with your choice of tiles and sanitaryware.

ItemTypical share of the budgetWhat drives it up
Sanitaryware and CP fittings (WC, basin, shower, taps)25–35%Wall-hung WC, concealed cistern, thermostatic or rain shower
Tiles, adhesive and laying20–30%Large-format or imported tiles, full-height wall tiling
Plumbing (CPVC supply, drain lines, floor trap)10–15%Moving the WC or drain point
Waterproofing and flood test8–12%Full-height shower walls, sunken floors
Demolition, debris removal and civil repairs8–12%Upper floors without a goods lift, hollow screed
Electrical, exhaust, lighting and ceiling5–10%New points, geyser relocation, PVC or gypsum ceiling

The biggest swing factors are tile size and brand, sanitaryware choice, whether the old plumbing is replaced, and how easy it is to carry debris out of the building.

What a Good Bathroom Renovation Quote Should Include

Before you compare prices, check that each quote lists:

  • The waterproofing product and system, how high it goes up the walls, and a flood test of at least 24–48 hours.
  • Pipe material and brand (CPVC for supply), and whether all old lines are replaced or only some.
  • Tile adhesive (not cement mortar) and epoxy grout in wet areas, with tile size and brand.
  • Floor slope to the drain, and the floor trap type.
  • Sanitaryware and fitting brands and model ranges, or an allowance per item.
  • Demolition and debris removal, including carrying charges in apartments.
  • The schedule, the payment stages and the warranty period in writing.

A quote that is much cheaper usually leaves one of these out, most often the waterproofing test or the plumbing replacement.

Full Renovation or Waterproofing Only?

Your situationWhat usually makes sense
Tiles sound and look fine, but the wall next door is dampFind the leak first. Often a targeted repair, see leakage repair
Bathroom 15+ years old, GI pipes, several hollow tilesFull renovation with new plumbing and waterproofing
Tiles dated but firmly bonded, no leaksTile-over-tile makeover with new fittings
Only the fittings are worn outRefresh: new CP fittings, regrouting, paint

Our Bathroom Renovation Process

1

Site visit and diagnosis

We check for leaks, hollow tiles (by tapping), floor slope, pipe condition and water pressure, and take measurements.

2

Written quote and design

You get an itemised quote with tile and fitting options and a 2D layout. Work starts only after you approve it in writing.

3

Protection and demolition

Floors and corridors outside are covered, and debris is bagged and removed the same day where the building allows.

4

Plumbing

Old GI lines are replaced with CPVC for water supply. All new lines are pressure-tested before they are closed in the wall.

5

Waterproofing

A polymer-modified cementitious or membrane coating goes on the floor and at least 300 mm up the walls (full height in the shower area), with corner reinforcement. We then flood the floor for a 48-hour ponding test and check the ceiling below for damp.

6

Tiling

Floor tiles are laid with a slope towards the drain, using polymer tile adhesive to IS 15477 and epoxy grout in wet zones.

7

Fittings, cleaning and handover

Sanitaryware, accessories and fixtures are fitted, the bathroom is deep cleaned, and we walk you through the work and the warranty.

See photos of completed Stylfixx projects in our project gallery.

Renovating Without Removing the Old Tiles

If the existing tiles are firmly bonded and level, new tiles can be laid directly over them with a suitable adhesive. This avoids demolition noise and dust and is popular in occupied apartments. It is not the right choice if tiles sound hollow, the bathroom already leaks, or the extra 8–12 mm of floor height would stop the door from closing. Our guide to bathroom renovation without removing tiles explains the options in detail.

Common Mistakes That Cause Problems Later

  • Laying tiles in cement mortar instead of tile adhesive, which leads to hollow and cracked tiles.
  • Skipping the flood test, so a waterproofing gap shows up only as a stain in the flat below.
  • A floor with too little slope, leaving water standing near the door.
  • Closing walls before pressure-testing new pipes.
  • Choosing a glossy floor tile; wet bathroom floors need an anti-skid finish. See which tiles are best for flooring.

Materials We Use

  • Vitrified, ceramic and anti-skid floor tiles from the brand you choose, such as Kajaria, Somany or Johnson.
  • Polymer-modified cementitious and membrane waterproofing systems, with the product named in your quote.
  • CPVC pipes and fittings for hot and cold water, with the brand named in your quote.
  • Sanitaryware and CP fittings from your chosen brand.

Why Homeowners Choose Stylfixx

A written, itemised quote before any work starts, with no hidden extras

A written, itemised quote before any work starts, with no hidden extras

One supervisor as your single point of contact through the job

One supervisor as your single point of contact through the job

Payments linked to finished stages, not a large advance

Payments linked to finished stages, not a large advance

A written warranty on waterproofing and workmanship, with the period stated in your quote

A written warranty on waterproofing and workmanship, with the period stated in your quote

Daily site cleanup and full debris removal

Daily site cleanup and full debris removal

Areas We Serve in Bangalore

HennurKalyan NagarHBR LayoutHRBR LayoutKammanahalliBanaswadiThanisandraHebbalHoramavuRT NagarFrazer Townand across Bengaluru

Related Services and Guides

Bathroom Renovation FAQs

In 2026, a full renovation of a typical 5x7 to 6x8 ft bathroom, including demolition, waterproofing, new plumbing, tiles and sanitaryware, usually costs ₹1.5 lakh to ₹3.5 lakh. A refresh without demolition costs ₹45,000 to ₹90,000, and a tile-over-tile makeover ₹80,000 to ₹1.5 lakh.

A full mid-range renovation of a 6x8 ft bathroom usually falls in the ₹1.8 to ₹3 lakh part of the range. Sanitaryware and fittings take about a quarter to a third of that, and tiles about a fifth to a third.

A full renovation takes 10 to 15 working days, including a 48-hour waterproofing test. A tile-over-tile makeover takes 6 to 9 days, and a fittings-only refresh 3 to 5 days.

Yes, if the old tiles are firmly bonded, level and the bathroom does not leak. New tiles are fixed over them with polymer adhesive. If tiles sound hollow or there is a leak, the old tiles should be removed and the waterproofing redone.

The floor and at least 300 mm of the walls (full height in the shower area) are coated with a polymer-modified cementitious or membrane system, reinforced at corners and pipe openings. The floor is then flooded for about 48 hours to check for leaks before any tiles are laid.

The waterproofing system and flood test, pipe material and brand, tile adhesive and epoxy grout, floor slope, sanitaryware brands or allowances, demolition and debris removal, the schedule, payment stages and the warranty period in writing.

Most Bangalore apartment associations need written notice or approval and set working hours and debris rules. Internal bathroom work does not normally need a building plan approval, but any change to structural walls or slabs does.

Not during a full renovation, as the bathroom is out of use for 10 to 15 days. In homes with one bathroom, a tile-over-tile makeover or a staged plan keeps downtime to a few days.

Stylfixx states the warranty period for waterproofing and workmanship in writing in your quote before work starts. Manufacturer warranties on tiles, sanitaryware and fittings are passed on to you.

Payments are split into stages linked to finished work, such as demolition and plumbing, the waterproofing test and tiling, and handover.

Book a free site visit for your bathroom renovation.